COMPLETED PROJECTS

WYNDHAM CHRISTIAN COLLEGE STAGE 1

Wyndham Christian Center was converted into Wyndham Christian College in December 2018. The project is being completed in stages as the school grows. 

 

Flowright was responsible for:

  • Removal of the Septic Tank and Connection to Sewer Main

  • Installation of Underground Sewer Line

  • Abolishing the Existing Water Tapping

  • Arranging the Underground Bore and Water Tapping for 100mm Fire Service and Potable Water Feed

​

ST ANTHONY'S PRIMARY SCHOOL REFURBISHMENT

St Anthony's Primary School underwent some much need renovations along with an extension. A new Learning Center, Classrooms, Hubs, Offices and Ancillary Areas were built. 

​

Flowright was responsible for:

  • Stormwater Alterations 

  • Installation of Storm Water Drain and Pits

  • Installation of Sewer Line 

  • Hot and Cold Water Supply Alterations 

  • Installation and Alterations of Fire Service and Hydrant

  • Installation of Hot Water Services 

CRC RESOURCE CENTER REDEVELOPEMENT

The gym at Catholic Regional College, Melton​ was redeveloped to form a new Learning Research Center. The space was also extended to create a new Canteen and Study Space. 

​

Flowright was responsible for:

  • Installation of Grease Interceptor Trap 

  • Installation of Sewer Line 

  • Hot and Cold Water Supply 

  • Installation of Hot Water Service

  • Installation and Alterations of Fire Service

  • Fit Off 

ST MARY MACKILLOP CHURCH REBUILD

St Mary Mackillop Church was rebuilt after being burnt down in 2015. 

​

​

​

Flowright was responsible for:

  • Installation of Grease Interceptor Trap 

  • Installation of Sewer Line 

  • Installation of Stormwater Drain, Pits and Pump Station

  • Hot and Cold Water Supply 

  • Installation of Hot Water Services 

  • Fit Off 

WYNDHAM CHRISTIAN COLLEGE STAGE 1A

Stage 1 was completed in early 2019 and Stage 1A was completed in 2020. Stage 1A comprises of a single building containing 6 classroom's, a staff room, staff amenities, offices and a toilet block for students. 

​

​

Flowright was responsible for:

  • Installation of Stormwater Drains and Pits

  • Installation of Sewer Line and Sewer Pump Station

  • Fire Service Installation. 

  • Hot and Cold Water Supply

  • Fit Off

KERR'S HIRE ADDITIONAL BUILDING 

An additional building has been built at Kerr's Hire in Ocean Grove. The double storey building comprises of an equipment storage space, office, showroom, wash bay and staff areas and amenities. 

​

Flowright was responsible for:

  • Installation of Stormwater Drains and Pits

  • Installation of SPEL Hydro System

  • Installation of Sewer Line 

  • Hot and Cold Water Supply

  • Fit Off

ST ANTHONY'S PRIMARY AMENITIES 
UPGRADE

During the school holidays an existing toilet block at St Anthony's Primary School were renovated. All fixtures were removed and the layout was changed. This was a time sensitive project that Flowright completed within the tight timeframe. 

​

Flowright was responsible for:

  • CCTV Inspection of Existing Drainage

  • Alteration of Sewer Drainage

  • Alteration of Water Lines 

  • Relocation of Hot Water Service

  • Installation of New Fixtures

ST CLARE'S PRIMARY ADDITIONAL BUILDING

The construction of the 2 storey building with classrooms, amenities and specialist learning spaces has been completed at St Clare's Primary School in Truganina. 

​

​

Flowright is responsible for:

  • Installation of Stormwater Drains and Pits

  • Installation of Sewer Line 

  • Installation of Sewer Pump 

  • Fire Service Installation 

  • Hot and Cold Water Supply

  • Fit Off 

CRC VCE EXTENSION

CRC Melton was extended in 2019, a new VCE center was added to the school to allow students to learn and take tests in a quite environment. 

​

​

Flowright was responsible for:

  • Installation of Sewer Line 

  • Installation of Stormwater Drainage 

  • Hot and Cold Water Supply 

  • Installation of Hot Water Service 

  • Fit Off 

​

CRC FIRE RING MAIN

CRC Melton has grown significantly over the years, a new fire ring main was required spanning over 500 meters to accommodate the needs of the school.

​

 

Flowright was responsible for:

  • Installation of Above and Below Ground Fire Service

  • Installation of Hydrants 

  • Capping Off Sections of Existing Fire Service

  • Hydro Excavation

  • Service Location

​

ST BERNADETTE'S PRIMARY REFURBISHMENT

St Bernadette's Primary School underwent a large refurbishment. The space was completely upgraded, comprising of common areas, classrooms, toilets blocks and a communal kitchen. 

​

Flowright was responsible for:

  • Sewer Alterations 

  • Relocation of Gas Meter 

  • Alterations to Hot and Cold Water Feed and Gas 

  • Installation of Hot Water Services 

  • Fit Off 

​

ST PAUL'S PRIMARY ADDITIONAL BUILDING

St Paul's Primary School had an additional building constructed to provide space for more classrooms. The building had it's own toilet block installed within. 

​

​

Flowright was responsible for:

  • Installation of Sewer Line 

  • Installation of Stormwater Drainage 

  • Installation of Hot and Cold Water Feed

  • Fit Off 

​

F45 WATERGARDENS FIT OUT

An empty store in Watergarden's was fit out as an F45 Gym. The gym had toilets and showers installed to accommodate the needs of their members.  

​

​

​

Flowright was responsible for:

  • Installation of Sewer Line 

  • Hot and Cold Water Supply 

  • Installation of Hot Water Service 

  • Fit Off 

FINE TOOTH COMPANY FIT OUT

An empty store in Tullamarine was converted into a dental surgery, comprising of dental rooms, a reception area, staff room, toilets and cleaners area. 

​

​

​

Flowright was responsible for:

  • Installation and Alterations of Suspended Sewer Line 

  • Hot and Cold Water Supply 

  • Installation of Hot Water Service 

  • Fit Off 

F45 MOONEE PONDS FIT OUT

An empty store in Moonee Ponds was fit out as an F45 Gym. The gym had toilets and showers installed to accommodate the needs of their members.  

​

​

​

Flowright was responsible for:

  • Installation of Sewer Line 

  • Hot and Cold Water Supply 

  • Installation of Hot Water Service 

  • Fit Off 

MECWACARE AGED CARE RENOVATION

A large renovation took place at Mecwacare Aged Care in Hoppers Crossing. The whole facility was refurbished in stages.  

​

​

​

Flowright was responsible for:

  • Sewer Alterations 

  • Hot and Cold Water Supply 

  • Gas Supply 

  • Installation of Hot Water Services

  • Fit Off 

LATIN TRANSPORT TRUCK DEPOT

A large truck depot has been built in Truganina. The large area has been concreted and a site office has been built. 

​

​

​

Flowright was responsible for:

  • Organisation of Sewer, Water and Stormwater Tappings 

  • Installation of Stormwater Drainage 

  • Installation of Sewer Line 

  • Installation of Hot and Cold Water 